Construction Obstruction Report

The Office of Disability Access (ODA) would like to thank Facilities Information Services for making this report available in an accessible format.   

May 2019 Construction Obstruction Report

Project Name: Biomedical Engineering Lab
Project Lead: Jan Mak
Project Start Date: 5/1/2018
Project End Date: 5/31/2019
Location Description: Northwest corner of Discovery Park main building.
Project Summary: Build a new lab space for biomedical engineering lab.
Areas Impacted: Pedestrian traffic on west side of building will be blocked for the duration of project.

Project Name: Facilities Fuel Tank Replacement
Project Lead: Chad Davenport
Project Start Date: 5/1/2019
Project End Date: 8/31/2019
Location Description: Southeast corner of Automotive Services
Project Summary: Replace current fuel tanks and upgrade to current Federal standards
Areas Impacted: Vehicular and pedestrian traffic will be blocked during construction.

Project Name: Santa Fe Entrance and Widow Replacement
Project Lead: Jeff Hilliard
Project Start Date: 5/13/2019
Project End Date: 7/12/2019
Location Description: North and east side of Santa Fe Hall
Project Summary: Replace flagstone entrance to building and windows.
Areas Impacted: Vehicular and pedestrian traffic will be blocked for project duration.

Project Name: North Texas Blvd Street Repair
Project Lead: City of Denton
Project Start Date: 4/29/2019
Project End Date: 5/10/2019
Location Description: Right southbound lane of North Texas between W. Prairie and Sycamore
Project Summary: Milling roadway, repair substrate and repave street
Areas Impacted: Pedestrian and vehicular traffic will be blocked for duration of project.

Project Name: College Inn Stairwell
Project Lead: Jeff Hilliard
Project Start Date: 5/20/2019
Project End Date: 8/2/2019
Location Description: Lot 12 area
Project Summary: Construct new egress stairway.
Areas Impacted: Vehicular and pedestrian traffic will be blocked for project duration.

Project Name: Coliseum Roof Repair
Project Lead: Gilly Gilland
Project Start Date: 2/25/2019
Project End Date: 12/31/2019
Location Description: Coliseum Roof
Project Summary: Repair roof and replace metal panels.
Areas Impacted: SW corner of building blocked to pedestrians.

Project Name: Lot 20 Expansion Phase 2A
Project Lead: Traci Jones
Project Start Date: 1/2/2019
Project End Date: 5/31/2019
Location Description: North side of Fouts Field from Risk Management Building to USB
Project Summary: Install new drainage infrastructure and build parking lot
Areas Impacted: Parking and pedestrians will be barred for duration in project area.

Project Name: Lot 20 Expansion Phase 2B
Project Lead: Traci Jones
Project Start Date: 1/15/2019
Project End Date: 7/20/2019
Location Description: South side of Fouts Field and surrounding parking lot
Project Summary: Construct new parking lot in place of Fouts Field
Areas Impacted: Vehicular and pedestrian traffic will be blocked for duration of project.

Project Name: Lot 20 Expansion Phase 4
Project Lead: Traci Jones
Project Start Date: 12/17/2018
Project End Date: 5/31/2019
Location Description: Main entrance to Lot 20 off of North Texas Blvd west to Risk Management building
Project Summary: Demolish existing lot and building new lot entrance to support bus traffic
Areas Impacted: Pedestrian and vehicular traffic will be blocked for duration of project.

Project Name: Hickory Street Capital Improvement Program
Project Lead: Atmos
Project Start Date: 11/1/2017
Project End Date: 5/31/2019
Location Description: Hickory Street between Avenue B and Welch Street
Project Summary: Replace existing gas main and service connections
Areas Impacted: Pedestrian and vehicular traffic may be impacted during project.

Project Name: SRB Greenhouse
Project Lead: Chad Davenport
Project Start Date: 4/1/2019
Project End Date: 9/30/2019
Location Description: SW corner of Science Research Building
Project Summary: Build new greenhouse
Areas Impacted: Pedestrians and parking will be restricted for duration

Project Name: Life Science Exhaust Upgrade
Project Lead: Scott Harris
Project Start Date: 5/11/2019
Project End Date: 8/25/2019
Location Description: Lot 8 parking lot
Project Summary: Upgrade lab fume hoods
Areas Impacted: Parking lot will be closed to traffic for the duration of the project.

Project Name: Bruce Hall Landscaping
Project Lead: Brandon Lacy
Project Start Date: 5/1/2019
Project End Date: 8/16/2019
Location Description: Landscape beds on west side of Bruce Hall
Project Summary: Upgrade landscaping and drainage improvements.
Areas Impacted: Pedestrian traffic may be impacted during project.

Project Name: Music Courtyard Renovation
Project Lead: Janell Cottam
Project Start Date: 5/15/2019
Project End Date: 9/30/2019
Location Description: Music Building courtyard
Project Summary: Renovate courtyard area outside Voertman Hall lobby
Areas Impacted: Pedestrian traffic will be blocked during construction.

Project Name: Union Dock & Parking Lot
Project Lead: Randy Salsman
Project Start Date: 5/10/2019
Project End Date: 8/31/2019
Location Description: Student Union loading dock area
Project Summary: Demolish existing paving and landscaping and install new drainage and pavement.
Areas Impacted: Pedestrian and vehicular traffic will be impacted during construction.

Project Name: Central Dining Hall
Project Lead: Jeannine Vail
Project Start Date: 2/11/2019
Project End Date: 5/31/2020
Location Description: Greenspace east of Business Leadership Building
Project Summary: Build new dining facility
Areas Impacted: Pedestrian traffic will be blocked for duration of project.

Project Name: Joe Greene Hall
Project Lead: Janna Morgan
Project Start Date: 1/11/2017
Project End Date: 6/1/2019
Location Description: SE section of Kerr Hall block
Project Summary: Construct new dormitory
Areas Impacted: Pedestrian and vehicular traffic blocked for project duration.

Project Name: Victory Hall Envelope
Project Lead: Jeff Hilliard
Project Start Date: 5/24/2019
Project End Date: 6/28/2019
Location Description: North and south breezeway courtyard entrances.
Project Summary: Resolve standing water issues in courtyard entrances.
Areas Impacted: Pedestrian traffic will be blocked during project.

Project Name: Indoor Practice Facility
Project Lead: Terri Pierce
Project Start Date: 9/12/2018
Project End Date: 7/31/2019
Location Description: Football practice fields
Project Summary: Build new indoor practice facility.
Areas Impacted: Pedestrian traffic will be blocked for project duration.