May 2019 Construction Obstruction Report

Project Name: Biomedical Engineering Lab
Project Lead: Jan Mak
Project Start Date: 5/1/2018
Project End Date: 5/31/2019
Location Description: Northwest corner of Discovery Park main building.
Project Summary: Build a new lab space for biomedical engineering lab.
Areas Impacted: Pedestrian traffic on west side of building will be blocked for the duration of project.

Project Name: Facilities Fuel Tank Replacement
Project Lead: Chad Davenport
Project Start Date: 5/1/2019
Project End Date: 8/31/2019
Location Description: Southeast corner of Automotive Services
Project Summary: Replace current fuel tanks and upgrade to current Federal standards
Areas Impacted: Vehicular and pedestrian traffic will be blocked during construction.

Project Name: Santa Fe Entrance and Widow Replacement
Project Lead: Jeff Hilliard
Project Start Date: 5/13/2019
Project End Date: 7/12/2019
Location Description: North and east side of Santa Fe Hall
Project Summary: Replace flagstone entrance to building and windows.
Areas Impacted: Vehicular and pedestrian traffic will be blocked for project duration.

Project Name: North Texas Blvd Street Repair
Project Lead: City of Denton
Project Start Date: 4/29/2019
Project End Date: 5/10/2019
Location Description: Right southbound lane of North Texas between W. Prairie and Sycamore
Project Summary: Milling roadway, repair substrate and repave street
Areas Impacted: Pedestrian and vehicular traffic will be blocked for duration of project.

Project Name: College Inn Stairwell
Project Lead: Jeff Hilliard
Project Start Date: 5/20/2019
Project End Date: 8/2/2019
Location Description: Lot 12 area
Project Summary: Construct new egress stairway.
Areas Impacted: Vehicular and pedestrian traffic will be blocked for project duration.

Project Name: Coliseum Roof Repair
Project Lead: Gilly Gilland
Project Start Date: 2/25/2019
Project End Date: 12/31/2019
Location Description: Coliseum Roof
Project Summary: Repair roof and replace metal panels.
Areas Impacted: SW corner of building blocked to pedestrians.

Project Name: Lot 20 Expansion Phase 2A
Project Lead: Traci Jones
Project Start Date: 1/2/2019
Project End Date: 5/31/2019
Location Description: North side of Fouts Field from Risk Management Building to USB
Project Summary: Install new drainage infrastructure and build parking lot
Areas Impacted: Parking and pedestrians will be barred for duration in project area.

Project Name: Lot 20 Expansion Phase 2B
Project Lead: Traci Jones
Project Start Date: 1/15/2019
Project End Date: 7/20/2019
Location Description: South side of Fouts Field and surrounding parking lot
Project Summary: Construct new parking lot in place of Fouts Field
Areas Impacted: Vehicular and pedestrian traffic will be blocked for duration of project.

Project Name: Lot 20 Expansion Phase 4
Project Lead: Traci Jones
Project Start Date: 12/17/2018
Project End Date: 5/31/2019
Location Description: Main entrance to Lot 20 off of North Texas Blvd west to Risk Management building
Project Summary: Demolish existing lot and building new lot entrance to support bus traffic
Areas Impacted: Pedestrian and vehicular traffic will be blocked for duration of project.

Project Name: Hickory Street Capital Improvement Program
Project Lead: Atmos
Project Start Date: 11/1/2017
Project End Date: 5/31/2019
Location Description: Hickory Street between Avenue B and Welch Street
Project Summary: Replace existing gas main and service connections
Areas Impacted: Pedestrian and vehicular traffic may be impacted during project.

Project Name: SRB Greenhouse
Project Lead: Chad Davenport
Project Start Date: 4/1/2019
Project End Date: 9/30/2019
Location Description: SW corner of Science Research Building
Project Summary: Build new greenhouse
Areas Impacted: Pedestrians and parking will be restricted for duration

Project Name: Life Science Exhaust Upgrade
Project Lead: Scott Harris
Project Start Date: 5/11/2019
Project End Date: 8/25/2019
Location Description: Lot 8 parking lot
Project Summary: Upgrade lab fume hoods
Areas Impacted: Parking lot will be closed to traffic for the duration of the project.

Project Name: Bruce Hall Landscaping
Project Lead: Brandon Lacy
Project Start Date: 5/1/2019
Project End Date: 8/16/2019
Location Description: Landscape beds on west side of Bruce Hall
Project Summary: Upgrade landscaping and drainage improvements.
Areas Impacted: Pedestrian traffic may be impacted during project.

Project Name: Music Courtyard Renovation
Project Lead: Janell Cottam
Project Start Date: 5/15/2019
Project End Date: 9/30/2019
Location Description: Music Building courtyard
Project Summary: Renovate courtyard area outside Voertman Hall lobby
Areas Impacted: Pedestrian traffic will be blocked during construction.

Project Name: Union Dock & Parking Lot
Project Lead: Randy Salsman
Project Start Date: 5/10/2019
Project End Date: 8/31/2019
Location Description: Student Union loading dock area
Project Summary: Demolish existing paving and landscaping and install new drainage and pavement.
Areas Impacted: Pedestrian and vehicular traffic will be impacted during construction.

Project Name: Central Dining Hall
Project Lead: Jeannine Vail
Project Start Date: 2/11/2019
Project End Date: 5/31/2020
Location Description: Greenspace east of Business Leadership Building
Project Summary: Build new dining facility
Areas Impacted: Pedestrian traffic will be blocked for duration of project.

Project Name: Joe Greene Hall
Project Lead: Janna Morgan
Project Start Date: 1/11/2017
Project End Date: 6/1/2019
Location Description: SE section of Kerr Hall block
Project Summary: Construct new dormitory
Areas Impacted: Pedestrian and vehicular traffic blocked for project duration.

Project Name: Victory Hall Envelope
Project Lead: Jeff Hilliard
Project Start Date: 5/24/2019
Project End Date: 6/28/2019
Location Description: North and south breezeway courtyard entrances.
Project Summary: Resolve standing water issues in courtyard entrances.
Areas Impacted: Pedestrian traffic will be blocked during project.

Project Name: Indoor Practice Facility
Project Lead: Terri Pierce
Project Start Date: 9/12/2018
Project End Date: 7/31/2019
Location Description: Football practice fields
Project Summary: Build new indoor practice facility.
Areas Impacted: Pedestrian traffic will be blocked for project duration.