Construction Obstruction Reports

August 2021 Construction Obstruction Report

 

Project Name: Terrill Hall MEP

Project Manager: Scott Harris

Project Start Date: 2021-03-15

Project End Date: 2022-03-31

Location Description: Areas to the East and West of Terrill Hall

Project Summary: Installation of new Fire Sprinkler System and rewiring of DataCom and TeleCom Systems

Areas Impacted: Pedestrian and vehicular traffic will be blocked for the duration of the project

 

 

Project Name: Art Project

Project Manager: Terri Pierce

Project Start Date: 2021-03-01

Project End Date: 2022-02-01

Location Description: Across Welch Street to the East of CVAD

Project Summary: Construction of new Art Facility

Areas Impacted: Pedestrian and vehicular traffic will be blocked for the duration of the project

 

 

Project Name: Library Mall MEP

Project Manager: Carl Parsons

Project Start Date: 2021-05-10

Project End Date: 2021-08-10

Location Description: South Library Mall and Willis Library Area

Project Summary: Improve reliability of fountain equipment

Areas Impacted: Pedestrian and vehicular traffic will be blocked for the duration of the project

Project Name: Hickory Street Repair

Project Manager: City of Denton

Project Start Date: 2020-08-31

Project End Date: 2021-09-04

Location Description: W Hickory Street from Bernard Street to S Carroll Boulevard

Project Summary: Repair of street and curbs

Areas Impacted: Pedestrian and vehicular traffic will be intermittently blocked for the duration of the project

 

 

 

 