August 2021 Construction Obstruction Report
Project Name: Terrill Hall MEP
Project Manager: Scott Harris
Project Start Date: 2021-03-15
Project End Date: 2022-03-31
Location Description: Areas to the East and West of Terrill Hall
Project Summary: Installation of new Fire Sprinkler System and rewiring of DataCom and TeleCom Systems
Areas Impacted: Pedestrian and vehicular traffic will be blocked for the duration of the project
Project Name: Art Project
Project Manager: Terri Pierce
Project Start Date: 2021-03-01
Project End Date: 2022-02-01
Location Description: Across Welch Street to the East of CVAD
Project Summary: Construction of new Art Facility
Areas Impacted: Pedestrian and vehicular traffic will be blocked for the duration of the project
Project Name: Library Mall MEP
Project Manager: Carl Parsons
Project Start Date: 2021-05-10
Project End Date: 2021-08-10
Location Description: South Library Mall and Willis Library Area
Project Summary: Improve reliability of fountain equipment
Areas Impacted: Pedestrian and vehicular traffic will be blocked for the duration of the project
Project Name: Hickory Street Repair
Project Manager: City of Denton
Project Start Date: 2020-08-31
Project End Date: 2021-09-04
Location Description: W Hickory Street from Bernard Street to S Carroll Boulevard
Project Summary: Repair of street and curbs
Areas Impacted: Pedestrian and vehicular traffic will be intermittently blocked for the duration of the project